The day before the HVAC installation
The day before I got my central heating and air conditioning installed was rather complex.
There was a lot of preparing I had to do.
Not only did I have to move things around my house, but I also had to do a lot of cleaning up. My house was really a mess. And it would not only have been embarrassing to have the heating and air conditioning company come out and see this, but it would also make them have a harder time in getting around and about to instal my brand new and up to date central heating and air conditioning system that I had just bought. I must have spent all day and most of the evening cleaning up and doing all the preparations that would make the entire central heating and air conditioning system unit installation go as smooth as possible for the local heating and air conditioning specialists from the local heating and cooling company. I also had to wake up extra early in the morning as well because the heating and cooling company only does the HVAC installations in the early morning because it takes some hours to get it going. And you never know if it is going to take 4 hours or possibly 8 hours. This all depends on the home and the heating and air conditioning system that they are installing. In my case, the heating and air conditioning system installation took a total of 5 hours which was pretty good considering several factors about my home and my new heating and air conditioning system.